Parking Lot Access Control Orange Color 6s 6m Straight Aluminum Arm Barrier Gate
Parking Barrier Gate Technical Data
Model
|
WJDZ04VF (speed 1.5~6s adjustable)
|
||||
Running Speed
|
1.5s-6s
|
6s
|
6s
|
6s
|
6s
|
Boom-Type
|
Straight
|
90° Folding
|
180° Folding
|
2 Fence
|
3 Fence
|
Max Boom Length
|
3-6m
|
5m
|
4m
|
4.5m
|
4m
|
Housing Dimension
|
336*325*1030MM, 335*285*920MM
|
||||
Input Voltage
|
AC100-265V
|
||||
Frequency
|
50/60HZ
|
||||
Motor Voltage
|
DC24V
|
||||
Enclosure Rating
|
IP54
|
||||
Working Temperature
|
-30℃~ + 70℃
|
||||
MTBF
|
4000000 times
|
||||
Traffic Flow Application
|
3000 times/ 24 hours
|
||||
Max Motor Power
|
180W
|
||||
Max Motor Speed
|
500r/min
|
||||
Max Torque
|
260N.m
|
Parking Barrier Gate Functions & Features
1. Motor Functions & Features Self - developed DC24V brushless motor, with stable and reliable worm gear and planetary reduction transmission structure, large torque, and wear resistance.
2. Control System Functions & Features DC variable - frequency control system, precise control, more flexible running, less mechanical impact and longer service life.
3. Auto - reversing on Obstruction Functions & Features Sensitive, responsive, safe and reliable.
4. Item Control Panel Functions & Features Large LCD screen display, English visual menu, simple maintenance and easy operation.
5. Remote Controller Functions & Features 433MHZ, simple to add remote controllers.
6. Operation during Power - off Functions & Features Turn the handwheel or lift the boom manually to realize the boom up and down, and it can also be powered by a DC24V battery, or open one time by a super capacitor backup.
7. Motorcade Passing, Counting, Auto - aging Test, Delay Auto - closing, Relay Signal Output, RS485 Communication Functions & Features Support
8. Loop Detector, Infrared Photocell, Radar Functions & Features Optional
9. Warranty Period Functions & Features 24 months for motor and control board
Straight boom installation
Step 1. Fix the boom holder press board on boom with 2pcs of M12*70mm hexagon screw.
Step 2. Press the board by hand, then lift up the boom vertically and install it on the boom holder.
Step 3. Install the flat washer, spring washer, and M12 nut on the screw in turn, and fix the screw with a wrench.